
Ground Improvement
Densify loose soils and fills to improve bearing performance and reduce settlement.
View methodsGEODEN is a specialist ground engineering contractor in Saudi Arabia, working in soil improvement, deep foundations and geotechnical execution.

We choose the method from the ground conditions, control production and verify the result by test, so the ground can carry what is built on it.
Each family starts from what the ground must achieve: density, stiffness, load transfer or proven performance.

Densify loose soils and fills to improve bearing performance and reduce settlement.
View methods
Transfer load to suitable strata where shallow support is insufficient.
View methods
Reinforce soft or variable ground, treat voids and stabilise platforms where densification alone is not enough.
View methods
Shoring and retention of excavations, slope stabilisation and groundwater control, so construction can proceed safely and dry.
View methods
Measure ground and foundation performance with CPT, plate load, pressuremeter and pile tests.
View methodsWe select the treatment around the ground condition and the performance requirement.
Trial parameters, production controls and measurable acceptance criteria are defined before full production.
Treatment is connected to CPT, plate load tests, pile tests or other project-specific verification.
Traceable records, plans and test results make consultant review easier.

Every method has its own technical page. Suitability is always confirmed against the site investigation and the required performance.

A towed non-circular roller delivers high-energy impacts to compact large areas and near-surface layers.

A hydraulic hammer strikes a steel foot that stays in contact with the ground, in rapid, controlled blows.

A heavy weight dropped from a crane on a planned grid densifies loose granular soils and fills to depth.

A depth vibrator rearranges sand grains into a denser state; suited to clean sands and hydraulic fills.

Cast-in-place reinforced concrete piles formed in a drilled shaft, for high loads and large depths.

Concrete pumped through a hollow auger as it is withdrawn; fast, quiet and low-vibration.

Small-diameter drilled and grouted piles for underpinning, tight access and tension loads.
Large granular columns driven into soft ground by a falling weight, using Dynamic Compaction equipment.

Stone columns formed with a depth vibrator reinforce soft or mixed soils and improve drainage.

Grouted columns with a load transfer platform carry load to deeper layers and control settlement.

Probe holes on a grid locate voids and weak zones, which are then filled with cement-based grout.

Cellular confinement of granular fill increases the stiffness and load spreading of a thin layer.

Polymer grids interlock with compacted fill to reinforce platforms, roads, slopes and embankments.

Rows of cast-in-place piles forming embedded retaining walls for basements and deep excavations.

Grouted steel nails and tensioned anchors stabilise excavation faces, slopes and retaining walls.

Sprayed concrete forms facings for soil nail walls and protects slopes and rock faces.

Temporary lowering of groundwater with sumps, wellpoints or deep wells so work can proceed in the dry.

An instrumented cone pushed into the ground gives a continuous profile of soil resistance, before and after treatment.

A loaded steel plate measures the ground's settlement response to give near-surface stiffness and bearing behaviour.

An inflatable probe expanded in a borehole measures in-situ stiffness and limit pressure at depth.

Static, dynamic and integrity tests confirm pile capacity, settlement behaviour and soundness.
Start from the ground problem in your site investigation. Each page shows how it is recognised and which methods are usually considered.
Every scope follows the same traceable sequence, so the consultant can see how the result connects back to the original requirement.
Ground model, groundwater and performance criteria agreed.
Parameters calibrated and tested before full production.
Point-by-point records against the agreed parameters.
Independent verification against the acceptance criteria.
As-built records, test reports and close-out documentation.
Grouped by capability.


A geotechnical report, drawings or a BOQ help us give a useful technical response. If you're not sure which method fits, ask for a technical review.